In the economic calculation of hydraulic project, the data such as net present worth, interal rate of return, benefit-cost ratio are all indexes, which only reflect relative figures of benefits, but not the actual benefits. 在水利工程经济计算中,净现值、内部收益率、效益费用比等都是指标,只表示效益的相对高低,而不是真正的效益值;
Taking maximum net present worth as an optimum target with consideration of factors of mining, beneficiation and metallurgy, a dynamic optimum methed for optimizing boundary grade of mine deposit is given. 提出了考虑采、选、冶三种因素,以净现值最大为优化目标的地下开采矿体边界品位动态优化方法。
The evaluate methods of safe investment economy benefit for coal mine are classified. The Net Present Worth ( NPW) method, the Annual method and the Internal Rate of Return ( IRR) method of the economic benefit evaluation are introduced. 对安全投资经济效益评价方法进行了分类,并对经济效益评价的现值法、年值法和内部报酬率法进行了分析;
On the compartment level, the objective function includes two components: Net Present Worth and Even Flow of the timber harvest. 在林班的水平上,经营目标方程包括两个组成部分:净现值和均衡木材收获值。